Questions that come up before a project starts
Most of what people ask us is practical: how long a permit takes, what we can document, and whether their street is one we have worked on before. Here are the answers we give most often.
What does a project entry in the archive actually include?
Each record holds before-and-after photographs, a floor plan sketch, material notes, and a short account of the decisions behind the build. We also note permit timelines, site constraints, and the trades that were on site, so the entry can be read as a reference rather than a highlight reel.
Can I filter the archive by neighbourhood?
Yes. Entries are grouped by category and by neighbourhood across the Roanoke Valley, so you can look at work near your own street or compare how similar lots were handled in Grandin Road, Wasena, or Cave Spring.
How long does a permit usually take here?
It depends on the scope. A kitchen rebuild inside an existing footprint has run through the city in just under five weeks. Additions and structural changes take longer, and sloped lots sometimes need footing details reviewed before framing can begin.
Can we stay in the house during the work?
Often, yes. On the Grandin Road kitchen the family stayed put the whole time by keeping a temporary sink in the laundry room. For larger additions we plan the sequence around which rooms stay usable and which ones close for a stretch.
Do you take on small jobs, or only full builds?
Both. Garage conversions, bathroom remodels, and small additions sit alongside new-build family homes in the archive. The documentation format stays the same regardless of size, which is what makes the entries comparable side by side.
What should I send to start a conversation?
A short brief is enough: your street, a rough sense of the scope, and a timeframe you have in mind. If you have photos or a sketch, include them. We will tell you what is realistic for your lot and what the next step looks like.