How we read a scope before anything gets priced
A few working definitions we use on every Roanoke Valley job. They exist so that a brief arrives with the same meaning on both sides of the table, and so nobody is surprised later by what a word like "remodel" or "addition" actually covers.
Full new build
A house from the ground up, including site work, foundation, framing, and finishes. Lot size, setback, and utility runs get settled before drawings, because they decide what can sit where. Permit review for a new build typically runs longer than for interior work.
Kitchen and bathroom remodel
Work inside the existing footprint. The variable that moves the schedule most is whether a wall is load-bearing, and whether plumbing can stay where it is. Moving a drain or a stack adds inspection steps and days, not just labor.
Wraparound porch and small addition
Anything that extends the conditioned envelope or the roofline. On sloped lots, footings often take longer than framing. We treat a porch as structure first and finish second, which is why the decking and posts are chosen after the foundation is set.
Garage conversion
Reusing a structure that already exists. Insulation, a subpanel, and a level floor usually matter more than cosmetics. Staying inside the original footprint often avoids a zoning variance, but it also limits how much light you can add.
Materials as trade-offs
Timber, tile and stone, cabinetry, cladding, and window and door systems are not upgrades in a ranking. Each one carries its own maintenance rhythm and aging pattern. We name those trade-offs instead of calling a finish "premium."
Budget bands, not figures
We talk in ranges tied to scope, because the same square footage can land in different bands depending on structure, permits, and how much of the house stays occupied during the work. A band is a planning tool, not a quote.
What we do not promise
Timelines shift when a permit reviewer asks for a revision, when a hidden condition turns up behind a wall, or when a trade is booked out. We would rather say that up front than hand over a schedule that reads clean and then slips. If a scope does not fit a lot, a structure, or a realistic sequence of trades, we say so before drawings start.